NOTA KONTRAK



Banyak terma-terma di dalam Pengurusan Kontrak projek kerajaan/JKR yang kurang difahami oleh kita semua... Bagaimana tatacara permohonan, prosidur, mengisi borang, proses kelulusan, bila masa nak guna dan lain-lain lagi???...

Sebagai contoh :

APP - Arahan Pegawai Penguasa

KPK - Kelulusan Perubahan Kerja

APK - Arahan Perubahan Kerja

PHK - Pelarasan Harga Kontrak VO+-
KKS - Kelulusan Kuantiti Sementara

WPS - Wang Peruntukan Sementara (Provisional Sum)

WKP - Wang Kos PrimaVOP - Variation of Price (Turun Naik Harga)

PDA - Preliminary Detailed Abstract

ATDA - As Tender Detailed Abstract
ACDA - As Complete Detail Abstract
Apa dia Perubahan, Tuntutan, Kesilapan Senarai Kuantiti...???dan banyakkkkk.......... lagi...........Kena buat kursus ni....


Contoh pengiraan % delay of every scope of works

Drainage :
Rancang - RM 230000 Sebenar - 100000

Therefore % Delay = 100% - (sebenar/rancang X 100)
= 100% - (100000/230000) X 100)
= -56.52% delay equal to ......days

Projek Sakit

Projek sakit di definasikan sebagai projek yang mengalami kelewatan sebanyak 20% atau 2 bulan. Oleh itu laporan menyelamat projek sakit perlu dibuat.

Sekiranya kelewatan melebihi 60 hari, notis penamatan kontraktor akan dikeluarkan. Pasukan pengawas juga perlu menyediakan laporan prestasi dan kemungkiran kontraktor untuk disyorkan kepada Pengarah Pembinaan.

Sekiranya kelewatan telah melebihi 90 hari, notis tujuan penamatan akan dikeluarkan dan selepas 2 minggu sekiranya tiada kemjuan notis penamatan akan dikeluarkan.

Nota :

Perkara di atas adalah berdasarkan pemahaman secara umum.

PENAMATAN KONTRAKTOR - Tindakan yang perlu di ambil- Highway

Terdapat beberapa langkah yang perlu diambil apabila berlakunya penamatan kontrak terhadap kontraktor, dimana kerja gagal disiapkan. Di antaranya ialah :

a. Perlu dilakukan Joint Measurement dan Joint Survey diantara pihak client dan kontraktor terhadap kerja-kerja yang telah dilakukan. Ia bertujuan untuk mendapatkan final quantity setakat mana kerja yang telah dilakukan. Joint survey perlu dilakukan pada jarak 20m interval.
b. Kontraktor perlu menyediakan as built drawing dimana di dalam lukisan as built perlu dinyatakan seperti contoh :
- earthworks - perlu dinyatakan pre com level, design level and current or existing level. Jika terdapat overcut di kawasan cutting, perlu dinyatakan kawasan over cut berserta quantity.
- structure - tandakan setakat mana yang telah di buat dan lorekkan bahagian yang sudah di buat. Nyatakan level jika perlu.
- turfing
- IP, VIP dan Titik Kawalan perlu dinyatakan sekali.
c. Inventory
d. Store penyimpanan barang beserta pengawal keselamatan
e. Material on site - perlu clarify yang mana perlu disimpan atau perlu dipulangkan kepada kontraktor. perlu disediakan inventory beserta photo.
f. Semua NCR perlu ditutup.
g. Penyimpanan dokumen.
h. Perlu jelas mengenai item yang dibayar contohnya untuk kerja filing rate yang dikira adalah termasuk spread, grade, compact, trim and testing. Sekiranya kontraktor tidak melakukan kerja-kerja trimming ia perlulah dipotong. To come out percentage every item.
i. Item-item yang dibekalkan oleh kontraktor (yang terdapat dalam kontrak) perlu di pulangkan.

PENYEDIAAN LAPORAN ATAU NOTE PENYELIAAN TAPAK

Senarai scope of works yang boleh dinyatakan :
  • Survey
  • Site clearing
  • Cuting and Filling until subgred level
  • USM seperti testting yang perlu untuk tentukan USM
  • Turfing dan hydro seeding
  • FDT test
  • Surface drainage
  • Pipe laying
  • Culvert/BC/VBC
  • Pavement - sub base, wet mix, prime coat, tack coat, ACBC,ACWC
  • Guard rail and roal line marking
  • Bridge work-survey setting out, piling works, test piles (MLT/PDA), pile cap, pier/column, abutment, casting beam, launching beam, daphragm, deck slab, paraphet wall, reinforce soil wall, approach slab, approach road and pavemant.
  • Ground treatment Remove and Replace (R&R), R&R with surcharge, R&R, PVD with surcharge.
  • Instrumentation with analisa
  • Gabion wall with reno matress
  • Traffic management (TMP)-temporary road furniture, road sign, road diversion
  • (Environmental EMP) - weter browser truck, tyre washing facilities, wash trough, silt fence, silt trap, check dam, skid tank.

Laporan mestilah mengandungi maklumat berikut :

  • Specification
  • Method Statement
  • Masukkan nota-nota berkaitan seprti nota yang tercatat dalam nota pembinaan
  • Perlu rujuk QAP
  • Progress photo
  • lab test
  • Checklist before work do
  • Maklumat rule of thumb
  • Factory visit atau testing required
  • Maklumat kelulusan bahan yang perlu di sertakan
  • Production rate berdasarkan sumber-sumber yang ada
  • SPK form
  • Kadar harga semasa
  • bar bending schedule
  • RFI
  • NCR
  • RFI

Sistem Penyampaian JKR

Sistem penyampaian JKR ialah Sistem Pengurusan Kualiti (SPK).

PEMBIAYAAN SEMULA RUMAH

Yuran Peguam (Legal Fees)
How to think Yuran Guaman; to SPA, the levels yuran / scale fees thought of the purchase price, scale of fees mistaken for your loan with the Bank.

RM150, 000 First - 1%
RM150, 001 to RM850, 000 - 0.7%
RM850, 001 to RM2, 000,000 - 0.6%
After RM 2,000,000 - 0.5%
and so on .... enough is up here.


Example,
Say your house price RM950 .000-00

First = 150.000 RM RM 1.500
After = 699.999 RM RM 4,899.99
RM 99.999 after = RM 599.99
Amount RM 6,999.99 or RM 7.000

So yuran guaman will apply is RM7 .000 to 00, plus 5% service tax amount in legal fees that wear is RM7, 350.00. If you take the zero pakej boarding moving, legal fees for SPA between banks with you to wear but not in high gain levels Little ..


Yuran Assessment (Valuation Fees)
This assessment in Yuran wear if you do not take pakej zero moving cost to the bank.


Value first hartanah RM 100.000 - 0.25%
100.001 RM to RM 1,900,000 - 0.2%
RM 1,900,001 to RM 5,000,000 - 0167%

Example
Kiraannya same as above.
Encik A has a housing loan as follows: --
Number of loans = RM 254.000
The number of monthly ansuran = RM 1,721.00
The period of loan = 25 years
The number of loans in 3 years to pay =
Encik A current age = 44 years
Value during the house (Current Market Value) = RM 350,000.00
Tray loans = RM 240,628.41
Avail levels during = 3.75% (BLR-1.80%) 5:55% BLR now.
Option 1 - Reduce monthly payments ansuran: --
Tray loans = RM 240,628.41
Period of the new loan = 22 years
New moon ansuran fee = RM 1339.92
Penjimatan month = RM 381.08
Number of penjimatan = RM 100,605.12