PENYEDIAAN LAPORAN ATAU NOTE PENYELIAAN TAPAK

Senarai scope of works yang boleh dinyatakan :
  • Survey
  • Site clearing
  • Cuting and Filling until subgred level
  • USM seperti testting yang perlu untuk tentukan USM
  • Turfing dan hydro seeding
  • FDT test
  • Surface drainage
  • Pipe laying
  • Culvert/BC/VBC
  • Pavement - sub base, wet mix, prime coat, tack coat, ACBC,ACWC
  • Guard rail and roal line marking
  • Bridge work-survey setting out, piling works, test piles (MLT/PDA), pile cap, pier/column, abutment, casting beam, launching beam, daphragm, deck slab, paraphet wall, reinforce soil wall, approach slab, approach road and pavemant.
  • Ground treatment Remove and Replace (R&R), R&R with surcharge, R&R, PVD with surcharge.
  • Instrumentation with analisa
  • Gabion wall with reno matress
  • Traffic management (TMP)-temporary road furniture, road sign, road diversion
  • (Environmental EMP) - weter browser truck, tyre washing facilities, wash trough, silt fence, silt trap, check dam, skid tank.

Laporan mestilah mengandungi maklumat berikut :

  • Specification
  • Method Statement
  • Masukkan nota-nota berkaitan seprti nota yang tercatat dalam nota pembinaan
  • Perlu rujuk QAP
  • Progress photo
  • lab test
  • Checklist before work do
  • Maklumat rule of thumb
  • Factory visit atau testing required
  • Maklumat kelulusan bahan yang perlu di sertakan
  • Production rate berdasarkan sumber-sumber yang ada
  • SPK form
  • Kadar harga semasa
  • bar bending schedule
  • RFI
  • NCR
  • RFI